Lake Mills Light & Water
Contact UsHomeSite Map





How to Reach Us
Payment Information
Electric Department
Water Department












Electric Department : Electric Rates
Electrical Safety
Outage Readiness

RESIDENTIAL Rg-1
Customer charge and minimum bill:
Single-Phase ..................$7.00 per month
Three-Phase ....................$14.00 per month
ENERGY CHARGE: ............................................$0.1028 per kWh plus PCAC


GENERAL
Customer charge and minimum bill:
Single-phase .......................... $7.00 per month
Three-phase .......................... $14.00 per month
ENERGY CHARGE: ..............$0.1060 per kWh plus PCAC

SMALL POWER Cp-1
Customers whose monthly demand is in excess of 50 kilowatts per month.
Customer charge: ................... $40.00 per month
Minimum bill = Customer charge plus Distribution Demand Charge
Distribution Demand Charge $1.25 per Kw of distribution demand
DEMAND CHARGE: ................$6.00 per kW of on-peak billed demand
ENERGY CHARGE: .................$0.0674 per kWh plus PCAC

LARGE POWER TIME-OF-DAY Cp-2
Available for all power customers whose monthly demand is in excess of 200 kilowatts per month.
Customer charge: ...............................$100.00 per month
Distribution Demand Charge:.............$1.50 per kW of distribution demand
Minimum bill = Customer charge plus distribution demand charge.
DEMAND CHARGE: .............................$7.50 per kW of on-peak billed demand
ENERGY CHARGE:
ON-PEAK: .......... $0.0763 per kWh plus PCAC
OFF-PEAK: .......... $0.0490 per kWh plus PCAC

INDUSTRIAL POWER TIME-OF-DAY Cp-3
Available for all power customers whose monthly demand is in excess of 1000 kilowatts per month.
Customer Charge: .............................. $250.00 per month
Distribution Demand Charge: ............$1.50 per kW of distribution demand
Minimum bill = Customer charge plus distribution demand charge.
DEMAND CHARGE: ...............................$ 8.00 per kW of on-peak billed demand
ENERGY CHARGE:
ON-PEAK: ................$0.0748 per kWh plus PCAC
OFF-PEAK: ...............$0.0460 per kWh plus PCAC
Primary metering discount: ......................2.00 percent discount on the monthly energy charge, distribution demand charge and demand charge.
Transformer Ownership discount: ........$0.25 per kW of distribution demand.

ON PEAK PERIOD – 7:00 a.m. to 9:00 p.m., Monday through Friday, excluding holidays.

COMMITMENT TO COMMUNITY RATES
Residential 2.4%
Commercial 1.2%
Cp-1 $ 7.50
Cp-2 $ 35.00
Cp-3 $ 50.00
Cp-4 $ 200.00

BLOCK CHARGE FOR RENEWABLE ENERGY
$3.00 per 300 kWh block of renewable energy per month.

STREET LIGHTING SERVICEMs-1
Applied to municipal street lighting. The utility will furnish, install and maintain street lighting units.

Investment charge:

Overhead:
175 W MV...............................$4.50 per lamp per month
70 W HPS (Decorative)..........$9.00 per lamp per month
100 W HPS.............................$4.50 per lamp per month
150 W HPS ...........................$5.00 per lamp per month
250 W HPS............................$6.00 per lamp per month
400 W HPS............................$6.50 per lamp per month
500 W Quartz.........................$5.50 per lamp per month
1500 W Quartz.......................$7.80 per lamp per month
150 W Spot............................$6.00 per lamp per month

Pole Charges:
Standard: .......................$3.00 per pole per month
Ornamental: ...................$9.00 per pole per month
Decorative: .....................$14.00 per pole per month

ENERGY CHARGE: $0.0540 per kWh plus PCAC
Note:
MV = Mercury vapor
HPS = High Pressure Sodium

Use shall be estimated as follows:
175 Watt Mercury Vapor – 68 kWh per month
70 Watt (Decorative) Sodium – 30 kWh per month
100 Watt Sodium – 43 kWh per month
150 Watt Sodium -- 72 kWh per month
250 Watt Sodium – 108 kWh per month
400 Watt Sodium – 180 kWh per month
500 Watt Quartz – 150 kWh per month
1500 Watt Quartz – 45 kWh per month
150 Watt Spot – 450 kWh per month

PCAC =Power Cost Adjustment Clause

All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales).
Applies to: Rg-1, Gs-1, Cp-1, Cp-2, Cp-3, Ms-1

© Copyright 2010  Lake Mills Light & Water | Privacy Statement